Quick start in sheet production – clear reduction of startup and changeover times and material consumption.
News
The new BREYER Melt Bank Monitoring System enables shorter startup times due to the extremely fast achievement of the set quality level.
Valuable raw material savings sustainably reduce your production costs!
The BREYER Melt Bank Monitoring System is especially suitable for the production of thin sheet. Due to the exact control of the melt bank and the visually supported adjustment of the melt flow a high sheet quality is achieved in the shortest possible time.
In the startup phase of a production process and after each change of the sheet thickness or raw material, the extrusion system has to be adjusted to the new conditions especially as regards the die and calender. This is very time-consuming and leads to waste before the quality of the sheet achieves the appropriate level.